To initiate the component test sequence, shut " OFF" the room
thermostat or disconnect the "R"
thermostat lead. Put setup switch "SW-6" in the " ON" position to
start the component test sequence.
Once initiated the main board will turn "ON" the inducer motor-low
speed, inducer motor-high speed, hot surface ignitor, blower motor-
high and blower motor-low speed, speed for 15-20 seconds each.

When component test is completed one or more of the following
codes will flash. Gas Valve and
Humidifier will not be turned on.

CODE
11 Indicates inducer and blower motor tested OK. Visual check of hot
surface ignitor required.